IBM Maximo for State & Local Government
Bridges, roads, facilities, fleets, and GASB 34 infrastructure reporting for state, county, and municipal agencies on IBM Maximo Application Suite
Overview
State DOTs, counties, and cities answer to councils, auditors, and the public for the condition of bridges, roads, buildings, and fleets. IBM Maximo has no separate government industry solution: public agencies run Maximo Manage with the industry solutions and add-ons that match their assets. Maximo Civil Infrastructure is built around NBIS and AASHTO element inspection for bridges and tunnels, with a deficiency-to-work-order loop. Maximo Real Estate and Facilities (formerly TRIRIGA) covers space, leases, capital projects, and facility operations, Maximo Transportation handles fleet, and Maximo Spatial connects work and assets to your ArcGIS data. Together they hold the inventory, condition assessments, and work and cost history behind GASB 34 infrastructure reporting. We help agencies plan their move off Maximo 7.6 and TRIRIGA, configure inspection and condition programs, and turn that data into capital plans they can defend.
What state & local government maintenance leaders are prioritizing
Deadlines for agencies on older platforms
IBM ended regular base support for Maximo Asset Management 7.6.1.x, including its industry solutions and add-ons, on September 30, 2025; paid Extended Support is limited, and IBM's path forward is Maximo Application Suite. IBM TRIRIGA is succeeded by Maximo Real Estate and Facilities in MAS 9.x. TRIRIGA ordering ended January 28, 2026, and support for all TRIRIGA versions ends September 30, 2027.
The problem
C grade for us bridges. ASCE 2025 Report Card for America's Infrastructure
6.8% of us bridges in poor condition. Out of more than 623,000 bridges nationwide
$191B bridge rehabilitation needs. Estimated system rehabilitation needs for US bridges
ASCE's 2025 Report Card gives the nation's bridges a C, and state and local owners carry much of the inspection and rehabilitation workload.
Agencies using the modified approach must keep an up-to-date inventory of eligible infrastructure, assess condition on an objective scale, and estimate what it costs to maintain assets at the disclosed condition level.
Maximo 7.6.1 base support has ended and TRIRIGA support ends in 2027, so agencies still on either platform need a funded migration plan.
Councils and legislatures want to see why one bridge, roof, or vehicle is replaced before another. Without condition and risk data, capital plans rest on age and anecdote.
Public works, facilities, fleet, and utilities often run separate systems and spreadsheets, so no one has a single view of assets, work, and cost across the agency.
Much maintenance is delivered by contractors. Agencies need work, cost, and inspection records they can audit, not just invoices.
How we fix it
Maximo Civil Infrastructure supports NBIS and AASHTO element inspection, NBI export, scour tracking, tunnel inspection, and a loop that turns deficiencies into work orders. It is an industry solution licensed with Premium AppPoints.
AI in practice
Maximo Visual Inspection and, from MAS 9.1, Large Vision Models can analyze inspection imagery; the Large Vision Model features require watsonx.ai.
Maximo holds the asset register, inspection and condition data such as Civil Infrastructure condition ratings, and the work and cost history needed for GASB 34 required supplementary information.
AI in practice
Maximo Health scores asset condition and risk, so preservation spending can be compared against the condition levels an agency has committed to.
Maximo Real Estate and Facilities, the successor to TRIRIGA, manages space, leases, portfolio, capital projects, facility condition, and facilities operations alongside Maximo Manage.
AI in practice
Space and utilization data can identify underused buildings and leases as candidates for consolidation.
Maximo Transportation tracks vehicles, meter- and mileage-based PMs, warranties, and components. Maximo Mobile puts work orders and inspections in crews' hands, and Maximo Spatial ties assets and work to ArcGIS maps.
AI in practice
Spatial queries can find all assets and open work in an area, which helps plan road work, storm response, and public works crews.
Maximo Health with asset investment planning helps build capital replacement scenarios from condition and risk scores. We plan and run upgrades from Maximo 7.6 and TRIRIGA to MAS 9, on client-managed OpenShift or IBM-managed SaaS.
AI in practice
Investment planning can compare replacement strategies across large asset populations and show the trade-offs behind each funding scenario.
Walk through your assets, integrations, and compliance needs with an engineer who has configured Maximo for your industry.
The platform
Compliance
Maximo holds the infrastructure inventory, objective condition assessments, and preservation cost estimates versus actuals that the modified approach requires.
Maximo Civil Infrastructure schedules bridge inspections, records element-level findings, and supports NBI data export.
Civil Infrastructure includes tunnel inspection so tunnel owners can manage inspections and deficiencies in the same system as bridges.
No. Government agencies run Maximo Manage with the industry solutions and add-ons that fit their assets, such as Civil Infrastructure for bridges and tunnels, Transportation for fleet, and Real Estate and Facilities for buildings.
The GASB 34 modified approach requires an up-to-date infrastructure inventory, objective condition assessments, and estimates of the cost to keep assets at the disclosed condition level. Maximo holds the asset register, inspection and condition data, and the work and cost history behind that reporting.
Yes. Maximo Civil Infrastructure is built around NBIS and AASHTO element inspection, supports NBI export and scour tracking, and turns inspection deficiencies into work orders.
IBM designates Maximo Real Estate and Facilities in MAS 9.x as the upgrade path for TRIRIGA. TRIRIGA ordering ended January 28, 2026, and support for all TRIRIGA versions ends September 30, 2027.
Regular base support for Maximo Asset Management 7.6.1.x ended September 30, 2025, including industry solutions and add-ons. IBM offers limited paid Extended Support and Sustained Support, and its path forward is Maximo Application Suite.
Yes. Client-managed MAS runs on Red Hat OpenShift on-premises or in an agency-controlled cloud, and IBM also offers MAS as a managed SaaS.
Maximo is generally positioned for large or complex organizations with many asset types. Smaller municipalities often compare it with Esri-centric tools such as Cityworks or with OpenGov, so the decision depends on asset scope and integration needs.
Yes. Maximo Health scores condition and risk, and asset investment planning uses those scores to compare replacement scenarios, which helps agencies explain capital priorities to councils and auditors.
Yes. Maximo can manage water, wastewater, and municipal utility assets in the same environment as roads and facilities. See our water and utilities pages for those programs.
Tell us where your maintenance program is today. We will tell you honestly what Maximo can and cannot do for it.