themaximoguys
Products
Solutions
Industries
Resources
Community
About
Careers

Get weekly AI + EAM insights

Every Thursday. Free. No spam.

themaximoguysthemaximoguys

PRODUCTS

  • All Products
  • Agentic AI
  • AI Assistant
  • Predictive Intelligence
  • Vision AI
  • IoT Monitoring

SOLUTIONS

  • All Solutions
  • Java to AutoScript
  • Data Conversion
  • MAS 9 Accelerators
  • AI Data Builders
  • Deployment Options
  • Maximo on AWS
  • Maximo on Azure
  • Maximo On-Premises

INDUSTRIES

  • Manufacturing
  • Oil & Gas
  • Utilities
  • Nuclear Power
  • All Industries

COMPANY

  • About Us
  • Careers
  • Blog
  • Resources
  • Contact

COMMUNITY

  • Community Hub
  • Developer Profiles
  • Events & Webinars
  • Write for Us
  • Newsletter

IBM, Maximo, and watsonx are trademarks of International Business Machines Corporation. SAP, Infor, and Oracle are trademarks of their respective owners. The Maximo Guys LLC is an independent consultancy and is not affiliated with or endorsed by IBM or any other trademark owner.

© 2026 themaximoguys. All rights reserved.

Terms of Service|Privacy Policy|Accessibility
Built for reliability engineers
Systems Online
    All industries

    IBM Maximo for Utilities

    Prioritize Grid Assets Before They Fail

    Compatible units, crews, transformer health, and NERC evidence (PRC-005, FAC-003, CIP) for electric T&D and gas distribution utilities on IBM Maximo Utilities

    Talk to a utilities specialistSee what we build
    • Maximo Manage
    • Maximo Utilities (industry solution)
    • Maximo Mobile
    • Linear assets (included in Manage)
    • Maximo Scheduler (included in Manage)
    • 01Transformer Health and Investment PlanningMaximo Health with Models for Electrical Distribution provides condition and risk scores for utility asset classes, including dissolved gas analysis for transformers. Asset Investment Planning (MAS 9.1 and later, requires Optimizer) builds capital replacement plans for transformers, poles, and other populations.
    • 02NERC Evidence from Work OrdersRelays, batteries, and sudden-pressure relays are managed as asset classes with PMs set to the PRC-005 interval tables. FAC-003 inspections run as linear-segment PMs, and completed, dated work orders form the evidence record.
    • 03Compatible Units, End to EndA compatible unit defines the labor, services, tools, and materials for a construction task. Maximo Utilities keeps them in a multilevel library that drives estimates and bills of materials, and integrates with graphical design and fixed-asset accounting systems.

    Overview

    How utilities teams run IBM Maximo

    Outages are getting longer and replacement equipment is harder to get: EIA reports US customers averaged 11 hours of interruptions in 2024, and NREL found distribution transformer lead times of up to two years. IBM Maximo Utilities is the industry solution on Maximo Manage built for this work across electric and gas transmission and distribution and power generation. It adds a multilevel compatible unit library for estimating, crew types and crew composition with skills and certification tracking, fixed-asset accounting and design tool integration, and GIS support. In MAS 9, Maximo Health with the Models for Electrical Distribution scores transformer condition, including dissolved gas analysis, while Asset Investment Planning helps rank scarce replacements. Dated PMs and completed work orders on relays, batteries, and line segments become the evidence NERC PRC-005 and FAC-003 ask for. We configure Maximo as the system of record for that work and integrate it with your OMS, GIS, and compliance tools.

    What utilities maintenance leaders are prioritizing

    • PRC-005 and FAC-003 evidence from dated work orders
    • Transformer health and capital replacement planning
    • Compatible unit estimating from design to as-built
    • Crew scheduling, qualifications, and mobile crew work
    • Storm restoration work integrated with the OMS
    • Gas distribution leak survey and repair under DIMP

    What happened to Maximo Health and Predict - Utilities?

    IBM's Health 8.9.0 release notes state that Maximo Health and Predict - Utilities is no longer a separate industry solution. The asset investment optimizer, the matrix, and DGA moved into Maximo Health, and the utility asset-class notebooks now ship as Maximo Models for Electrical Distribution, included in Health by default from 9.2. Linear Asset Manager is now Linear assets in Manage, Calibration is included in Manage, and Maximo Anywhere has been replaced by Maximo Mobile.

    The problem

    What holds utilities maintenance back

    11 hrs average us outage time in 2024. Nearly twice the annual average of the decade before

    US EIA, Today in Energy (2025)

    80% of 2024 outage hours from major events. Hurricanes Beryl, Helene, and Milton drove most hours without electricity

    US EIA, Today in Energy (2025)

    Up to 2 yrs distribution transformer lead times. A 4x increase on lead times before 2022

    NREL, Major Drivers of Long-Term Distribution Transformer Demand (2024)
    01

    Longer, Storm-Driven Outages

    EIA attributes most of the hours customers spent without power in 2024 to major events such as Hurricanes Beryl, Helene, and Milton, which puts pressure on restoration crews, materials, and mutual-aid coordination.

    02

    Transformer Shortage and Aging Fleet

    Long lead times and higher prices for distribution and power transformers mean utilities must decide which units to replace first, using defensible condition and risk data.

    03

    NERC Evidence Burden

    PRC-005 protection system maintenance and FAC-003 vegetation inspections both name dated work orders as acceptable evidence. Missing or inconsistent records turn a routine audit into a scramble.

    04

    Design to Construction to Accounting

    T&D construction work has to flow from design and estimate to work order, as-built, and fixed-asset accounting. Disconnected tools mean re-keyed data and estimates that drift from actual cost.

    05

    Crew Qualifications and Dispatch

    Crews need the right qualifications, supervisors, and travel-aware assignments, and labor has to be captured for every crew member without paper timesheets.

    06

    Linear Networks and Vegetation Cycles

    Lines, feeders, and gas mains run for long distances. Vegetation and leak-survey programs need segment-level scheduling and map-based inspection, not single-point asset records.

    How we fix it

    What we build for utilities on IBM Maximo

    01

    Transformer Health and Investment Planning

    Maximo Health with Models for Electrical Distribution provides condition and risk scores for utility asset classes, including dissolved gas analysis for transformers. Asset Investment Planning (MAS 9.1 and later, requires Optimizer) builds capital replacement plans for transformers, poles, and other populations.

    AI in practice

    In 9.2, Asset Investment Planning adds job-plan-costed intervention templates with OpEx and CapEx split, lead time, and downtime, plus query-based strategies for large asset populations.

    02

    NERC Evidence from Work Orders

    Relays, batteries, and sudden-pressure relays are managed as asset classes with PMs set to the PRC-005 interval tables. FAC-003 inspections run as linear-segment PMs, and completed, dated work orders form the evidence record.

    AI in practice

    Maximo Mobile 9.2 inspections capture geolocation as points, lines, or polygons, so vegetation and line findings are tied to the right segment.

    03

    Compatible Units, End to End

    A compatible unit defines the labor, services, tools, and materials for a construction task. Maximo Utilities keeps them in a multilevel library that drives estimates and bills of materials, and integrates with graphical design and fixed-asset accounting systems.

    AI in practice

    Maximo Spatial (Esri ArcGIS based) puts work and assets on the map and supports spatial queries for design and construction planning.

    04

    Crews in MAS 9

    MAS 9.1 extended qualifications to crews, and Manage 9.2 adds a crew supervisor field and automatic crew inactivation. Maximo Mobile 9.2 lets crews view, accept, and complete crew work orders, with timers that create labor transactions for all active crew members.

    AI in practice

    Scheduler, the dispatching dashboard, and Optimizer can optimize crew and labor assignments, and 9.2 adds travel time and handling of labor or crew unavailability.

    05

    Storm Mode with Your OMS

    Maximo is not an outage management system. Utilities integrate Maximo with an OMS or ADMS through the Maximo Integration Framework, then use Maximo for restoration work orders, crews, materials, and labor capture.

    AI in practice

    Weather-based outage forecasting comes from IBM Outage Prediction, a separate IBM product, while Maximo handles the restoration work and asset records.

    Planning a Maximo rollout or MAS 9 upgrade in utilities?

    Walk through your assets, integrations, and compliance needs with an engineer who has configured Maximo for your industry.

    Book a working session

    The platform

    IBM Maximo Application Suite modules we deploy

    • Maximo Manage
    • Maximo Utilities (industry solution)
    • Maximo Mobile
    • Linear assets (included in Manage)
    • Maximo Scheduler (included in Manage)
    • Maximo Spatial
    • Maximo Optimizer
    • Maximo Health (Manage add-on)
    • Maximo Models for Electrical Distribution
    • Asset Investment Planning
    • Maximo Predict
    • Maximo Monitor
    • Maximo Visual Inspection
    • Maximo Health, Safety and Environment (HSE)

    Compliance

    Regulations we configure Maximo around

    • NERC PRC-005-6 Protection System Maintenance

      Relay, battery, and sudden-pressure relay PMs set to the standard's maximum intervals, with completed, dated work orders as evidence and reporting on overdue items.

    • NERC FAC-003-5 Transmission Vegetation Management

      Linear-segment inspection PMs, Spatial maps, and geolocated mobile inspections produce the completed and dated work orders the standard accepts as evidence.

    • NERC CIP Standards, including CIP-015-1

      Maximo can hold BES Cyber System asset inventories, change and patch work orders, and physical-security maintenance records. It is an evidence source, not a CIP compliance engine; network monitoring needs OT security tools.

    • PHMSA 49 CFR 192 Subpart P (DIMP)

      Gas mains and services as linear assets, leak survey PMs, and leak repair work orders support a distribution integrity management plan.

    • NESC (IEEE C2)

      Inspection programs for overhead and underground lines are scheduled and recorded as PMs and inspection work orders.

    • IEEE 1366 Reliability Indices

      Outage-related work order and asset data, combined with OMS data, feeds SAIDI and SAIFI reporting to state regulators.

    • ISO 55001 Asset Management

      Health risk scores and Asset Investment Planning support risk-based capital plans within an ISO 55001 asset management system.

    FAQ

    IBM Maximo for Utilities: common questions

    Ask us something else
    What is IBM Maximo Utilities?

    It is an IBM industry solution on Maximo Manage that puts gas and electric transmission and distribution and power generation work and asset management on one platform. Its utility features include a multilevel compatible unit library with estimating, crew types and crew composition with skills tracking, fixed-asset accounting integration, design tool integration, and GIS support.

    What are compatible units in Maximo?

    A compatible unit defines the labor, services, tools, and materials needed to do a construction task. Compatible units live in a library and drive estimates and bills of materials for T&D design and construction work.

    Is Maximo Health and Predict - Utilities still available?

    No. IBM's Health 8.9.0 release states it is no longer a separate industry solution. Its capabilities moved into Maximo Health, and the utility asset-class notebooks now ship as Maximo Models for Electrical Distribution, included in Health by default from 9.2.

    Can Maximo do dissolved gas analysis (DGA) for transformers?

    Yes. Maximo Health includes DGA, and the Models for Electrical Distribution include asset-class notebooks that compute scores or DGA for specific classes, running on Watson Studio.

    Does Maximo handle storm and outage response?

    Maximo manages crews, emergency work orders, materials, and labor capture, but it is not an outage management system. Utilities normally integrate Maximo with an OMS or ADMS for outage events and use Maximo for restoration work and asset records.

    How does Maximo support NERC PRC-005?

    PRC-005-6 requires a Protection System Maintenance Program with maximum intervals and names dated work orders and maintenance records as acceptable evidence. Maximo PMs, job plans, and completed work orders on each relay, battery, and sudden-pressure relay produce that evidence.

    How does Maximo support NERC FAC-003 vegetation management?

    FAC-003-5 requires recurring vegetation inspections of applicable transmission lines and accepts completed and dated work orders as evidence. Linear-segment inspection PMs in Maximo, with Spatial for maps, provide that record.

    Does Maximo automate NERC CIP compliance?

    Not by itself. Maximo can hold BES Cyber System asset inventories, change and work records, and evidence, while dedicated compliance platforms handle CIP program management and OT security tools handle network monitoring.

    What's new for utility crews in MAS 9?

    MAS 9.0 added qualifications on job plans and work orders, and 9.1 extended them to crews. Manage 9.2 adds automatic crew inactivation and a crew supervisor field, and Maximo Mobile 9.2 lets crews view, accept, and complete crew work orders with timers that record labor for every active crew member.

    Are linear assets, Scheduler, and Spatial included in MAS 9?

    Linear assets, Scheduler, Calibration, and Mobile are included in Manage in MAS 9. Spatial and Optimizer need additional AppPoints, and Utilities is a Premium-tier industry solution.

    Related industries

    Water & Wastewater
    Oil & Gas
    Nuclear Power
    Transportation & Logistics

    Get more out of IBM Maximo in utilities

    Tell us where your maintenance program is today. We will tell you honestly what Maximo can and cannot do for it.

    Talk to a utilities specialistAll industries
    Sources & references (5)
    • IBM Docs — Maximo Utilities product overview
    • IBM Support — Maximo Health 8.9.0 release (HPU change)
    • IBM Docs — Maximo Models for Electrical Distribution
    • IBM — Maximo for energy and utilities
    • Utility Dive — Electric transformer shortage (NREL, NIAC)