themaximoguys
Products
Solutions
Industries
Resources
Community
About
Careers

Get weekly AI + EAM insights

Every Thursday. Free. No spam.

themaximoguysthemaximoguys

PRODUCTS

  • All Products
  • Agentic AI
  • AI Assistant
  • Predictive Intelligence
  • Vision AI
  • IoT Monitoring

SOLUTIONS

  • All Solutions
  • Java to AutoScript
  • Data Conversion
  • MAS 9 Accelerators
  • AI Data Builders
  • Deployment Options
  • Maximo on AWS
  • Maximo on Azure
  • Maximo On-Premises

INDUSTRIES

  • Manufacturing
  • Oil & Gas
  • Utilities
  • Nuclear Power
  • All Industries

COMPANY

  • About Us
  • Careers
  • Blog
  • Resources
  • Contact

COMMUNITY

  • Community Hub
  • Developer Profiles
  • Events & Webinars
  • Write for Us
  • Newsletter

IBM, Maximo, and watsonx are trademarks of International Business Machines Corporation. SAP, Infor, and Oracle are trademarks of their respective owners. The Maximo Guys LLC is an independent consultancy and is not affiliated with or endorsed by IBM or any other trademark owner.

© 2026 themaximoguys. All rights reserved.

Terms of Service|Privacy Policy|Accessibility
Built for reliability engineers
Systems Online
    All industries

    IBM Maximo for Facilities Management

    Move from TRIRIGA to Maximo Real Estate and Facilities

    Maximo Real Estate and Facilities (formerly TRIRIGA) on MAS 9: leases, space, capital projects, and maintenance on one suite, with a planned path off TRIRIGA

    Talk to a facilities management specialistSee what we build
    • Maximo Real Estate and Facilities (formerly TRIRIGA)
    • Maximo Manage
    • Maximo Mobile (included in Manage)
    • Maximo Scheduler (included in Manage)
    • Maximo Monitor
    • 01TRIRIGA to Maximo Real Estate and Facilities MigrationIBM says existing TRIRIGA databases, data, and configurations can be brought into MAS through a platform upgrade, which may also require a database conversion, license reassignment, and integration changes. Workloads move from TRIRIGA process servers to OpenShift pods, and licensing and users move to the suite level.
    • 02Native Manage Integration in MREF 9.2MREF 9.2 integrates natively with Maximo Manage: locations and assets synchronize, and MREF service requests create work orders in Manage. It replaces the legacy TRIRIGA connector and uses cluster certificates with a Manage Integration Manager app.
    • 03Leases and Workplace in MREF 9.2AI lease abstraction accepts lease documents in PDF or DOCX, fills in key fields, and shows where each value came from so a person can review it. Dynamic space planning adds markup and space assessments, and the Reserve app syncs with Outlook delegates.

    Overview

    How facilities management teams run IBM Maximo

    IBM TRIRIGA now continues as Maximo Real Estate and Facilities (formerly TRIRIGA), or MREF, the designated upgrade path that runs inside Maximo Application Suite 9.x. It covers lease administration, space planning, capital projects, facility condition, and environmental and energy management, and it shares MAS user management, AppPoints licensing, and Red Hat OpenShift with Maximo Manage. IBM ends base support for all TRIRIGA and TRIRIGA Application Suite versions on 30 September 2027, so every TRIRIGA customer needs a migration decision now. MREF 9.2 adds native Manage integration, where locations and assets synchronize and service requests create Manage work orders, along with AI lease abstraction, dynamic space planning, and a Reserve app with IoT occupancy check-in. We plan and run the TRIRIGA to MREF migration, connect MREF to Manage and your building systems, and build the maintenance programs that keep your portfolio compliant.

    What facilities management maintenance leaders are prioritizing

    • Plan the TRIRIGA to Maximo Real Estate and Facilities migration
    • Connect MREF service requests to Manage work orders
    • Modernize lease and space management with MREF 9.2
    • Bring BMS telemetry into the maintenance workflow
    • Map PM programs to NFPA, ASHRAE, and OSHA requirements
    • Reduce deferred maintenance with condition data
    • Support building performance standard retrofits

    TRIRIGA to Maximo Real Estate and Facilities: key dates

    New orders for TRIRIGA, TRIRIGA Application Suite, and TRIRIGA SaaS ended on 28 January 2026. Base support for all TRIRIGA and TAS versions ends on 30 September 2027, after which IBM moves them to Sustained Support for up to five years. Customers who trade up to a MAS license receive dual support until 30 April 2029 and must stop using TRIRIGA once the technical migration to Maximo Real Estate and Facilities is complete.

    The problem

    What holds facilities management maintenance back

    32% space heating share of energy. Largest end use in U.S. commercial buildings, which consumed 6.8 quadrillion Btu in 2018

    U.S. EIA, Today in Energy

    Over 2/3 nyc emissions from buildings. Share of New York City greenhouse gas emissions that come from buildings

    NYC Department of Buildings, Local Law 97
    01

    TRIRIGA Support Deadline

    TRIRIGA base support ends in September 2027. Teams must choose between Sustained Support, migrating to Maximo Real Estate and Facilities, or re-platforming, and plan database, license, and integration changes.

    02

    Real Estate and Maintenance in Separate Systems

    When leases, space, and capital projects live in an IWMS and work orders live in a separate CMMS, service requests are re-keyed and location data drifts between systems.

    03

    Manual Lease Administration

    Abstracting key dates, terms, and obligations from lease documents by hand is slow and error-prone, and missed critical dates carry real cost.

    04

    BMS Data Silos

    Building management systems from different vendors across a portfolio keep telemetry separate from maintenance records, so faults surface as comfort complaints instead of planned work.

    05

    Deferred Maintenance Backlog

    Capital planning needs consistent condition assessments and priority scoring across thousands of building systems, and backlogs grow when that data is missing.

    06

    Building Performance Standards

    NYC Local Law 97 and similar laws set emissions limits for large buildings. Meeting them depends on executing retro-commissioning and equipment replacement work on time.

    How we fix it

    What we build for facilities management on IBM Maximo

    01

    TRIRIGA to Maximo Real Estate and Facilities Migration

    IBM says existing TRIRIGA databases, data, and configurations can be brought into MAS through a platform upgrade, which may also require a database conversion, license reassignment, and integration changes. Workloads move from TRIRIGA process servers to OpenShift pods, and licensing and users move to the suite level.

    AI in practice

    MREF 9.2 bundles a User Migration Tool and supports merging Object Migration packages, and the dual support window lets TRIRIGA keep running while the migration is completed.

    02

    Native Manage Integration in MREF 9.2

    MREF 9.2 integrates natively with Maximo Manage: locations and assets synchronize, and MREF service requests create work orders in Manage. It replaces the legacy TRIRIGA connector and uses cluster certificates with a Manage Integration Manager app.

    AI in practice

    Real estate and maintenance share one location hierarchy, so maintenance cost and history can be viewed alongside lease and space data.

    03

    Leases and Workplace in MREF 9.2

    AI lease abstraction accepts lease documents in PDF or DOCX, fills in key fields, and shows where each value came from so a person can review it. Dynamic space planning adds markup and space assessments, and the Reserve app syncs with Outlook delegates.

    AI in practice

    When MREF is integrated with Maximo Monitor, room reservations can check users in automatically from IoT occupancy sensors and cancel no-shows. Lease abstraction requires the MAS AI Service.

    04

    BMS to Maximo Monitor

    The Edge Data Collector device library in Maximo Monitor includes BACnet/IP connectors, with scan-by-protocol discovery and a CSV import template. In Monitor 9.2 the IoT Platform is no longer required. BACnet MS/TP networks need a BACnet/IP router or gateway.

    AI in practice

    Monitor's anomaly detectors can flag abnormal chiller and air handler behavior, and Maximo Health and Predict can use that data for condition scores and remaining useful life. Fault detection rules are built for your equipment; IBM does not ship a packaged HVAC FDD library.

    05

    Compliance-Mapped PM Programs

    NFPA 25 and NFPA 72 inspection, testing, and maintenance tasks, ASHRAE 180 HVAC tasks, and ASHRAE 188 water management control points can be loaded as job plans and PMs, with route-based inspections on Maximo Mobile and deficiencies raised as corrective work orders.

    AI in practice

    The Reliability Strategies library provides failure modes and PM tasks for common asset types as a starting point for HVAC and building system PM programs.

    Planning a Maximo rollout or MAS 9 upgrade in facilities management?

    Walk through your assets, integrations, and compliance needs with an engineer who has configured Maximo for your industry.

    Book a working session

    The platform

    IBM Maximo Application Suite modules we deploy

    • Maximo Real Estate and Facilities (formerly TRIRIGA)
    • Maximo Manage
    • Maximo Mobile (included in Manage)
    • Maximo Scheduler (included in Manage)
    • Maximo Monitor
    • Edge Data Collector (BACnet/IP)
    • Maximo Health (Manage add-on)
    • Maximo Predict
    • Maximo Optimizer
    • Maximo Spatial
    • Maximo Service Provider
    • Reliability Strategies
    • Maximo AI Service
    • IBM Envizi (separate IBM product)

    Compliance

    Regulations we configure Maximo around

    • NFPA 25 Water-Based Fire Protection ITM

      PMs and job plans per component frequency, route-based inspections on Maximo Mobile, deficiency work orders, and audit history support sprinkler, standpipe, and fire pump programs.

    • NFPA 72 Fire Alarm and Signaling

      Fire alarm inspection and testing follows the same PM and inspection pattern, with results recorded against each device.

    • ASHRAE/ACCA Standard 180 HVAC Inspection & Maintenance

      Standard 180 task tables can be loaded as job plans and PM masters, with condition data from Maximo Monitor documenting the maintenance program.

    • ASHRAE 188 Legionellosis Risk Management

      PMs and meter readings for temperature and disinfectant residual, with out-of-range alerts, support a building water management program.

    • OSHA 29 CFR 1910.147 Lockout/Tagout

      Hazards, precautions, and lockout/tagout steps on job plans and work orders, plus HSE permits, keep energy control in the maintenance workflow. The annual periodic inspection can be scheduled as a PM.

    • NYC Local Law 97 and Building Performance Standards

      Maximo executes the work: retro-commissioning, equipment replacement, and PM on high-emitting systems. Emissions are calculated in ENERGY STAR Portfolio Manager or IBM Envizi.

    • ISO 41001 Facility Management Systems

      KPIs, SLA evidence, service catalogs, and continual-improvement records in Maximo support an ISO 41001 management system and complement ISO 55001.

    FAQ

    IBM Maximo for Facilities Management: common questions

    Ask us something else
    What is IBM Maximo Real Estate and Facilities?

    Maximo Real Estate and Facilities (formerly TRIRIGA) is the evolution of IBM TRIRIGA: an integrated workplace management system that runs inside Maximo Application Suite 9.1 and later. It covers lease administration, space planning, capital projects, facilities maintenance, and environmental and energy management, and shares MAS user management, AppPoints licensing, and OpenShift with Maximo Manage.

    When does IBM TRIRIGA support end?

    IBM ends base support for all versions of TRIRIGA and TRIRIGA Application Suite on 30 September 2027. New orders, including TRIRIGA SaaS, ended on 28 January 2026, and after base support ends IBM provides Sustained Support for up to five years.

    Is Maximo Real Estate and Facilities just TRIRIGA renamed?

    The functionality is largely the same, but it runs on a new platform. IBM says existing TRIRIGA databases, data, and configurations can be brought into MAS through a platform upgrade, which may also require a database conversion, license reassignment, and integration changes.

    Can I keep running TRIRIGA while I migrate to MAS?

    Yes, for a limited window. Customers who trade up their TRIRIGA license to MAS receive dual support until 30 April 2029 and must stop using TRIRIGA once the technical migration is complete.

    What is the difference between Maximo and TRIRIGA?

    Maximo Manage is an EAM focused on maintenance, reliability, and the asset lifecycle. TRIRIGA, now Maximo Real Estate and Facilities, is an IWMS focused on real estate portfolios, leases, space, and capital projects. In MAS 9.2 the two integrate natively, with location and asset sync and service requests that create Manage work orders.

    Can Maximo connect to my building management system?

    Yes. The Edge Data Collector device library in Maximo Monitor includes BACnet/IP connectors along with Modbus and OPC-UA. BACnet MS/TP serial networks are not confirmed, so plan for a BACnet/IP router or gateway.

    Does Maximo Real Estate and Facilities integrate with Maximo Manage?

    Yes. In MREF 9.2 the integration is native: locations and assets synchronize between the two, and MREF service requests create work orders in Manage, replacing the legacy TRIRIGA connector.

    Can AI read my leases in Maximo Real Estate and Facilities?

    Yes, in MREF 9.2. AI lease abstraction takes lease documents in PDF or DOCX, fills in key fields, and shows the source location of each extracted value so a person can review it. It requires the MAS AI Service.

    Can MREF check in meeting rooms with occupancy sensors?

    Yes, in MREF 9.2. When MREF is integrated with Maximo Monitor, the room reservation apps check users in automatically when an IoT occupancy sensor detects presence and cancel no-shows.

    Is Envizi included in Maximo Application Suite?

    No. IBM Envizi ESG Suite is a separately licensed SaaS product. MAS provides the IBM Maximo Connector for Envizi, which runs on App Connect flows.

    Related industries

    Healthcare
    Utilities
    Pharmaceuticals

    Get more out of IBM Maximo in facilities management

    Tell us where your maintenance program is today. We will tell you honestly what Maximo can and cannot do for it.

    Talk to a facilities management specialistAll industries
    Sources & references (6)
    • IBM Support: Maximo Real Estate and Facilities, the evolution of TRIRIGA
    • IBM Support: MAS and TRIRIGA dual support
    • IBM Docs: Upgrading from TRIRIGA to Maximo Real Estate and Facilities
    • IBM Support: Maximo Monitor 9.2.0
    • IBM Docs: Maximo Connector for Envizi
    • IMT: Comparison of U.S. building performance standards