Piloting Bob on Maximo: Metrics, Competitors, and the Open Questions
🎯 Who this is for: Maximo leads, delivery managers, architects, and the person who has to defend an AI tooling budget in front of finance. You have read the Bob pitch and the 69% headline. You now need to decide what to do on Monday: buy, wait, or run an experiment, and how to make the experiment prove something.
Series: IBM Bob for Maximo Teams | Part 5 of 5 (finale) | Read time: ~40 minutes
Previous: Part 4, Bob Meets Maximo | Series index: Start here
🔥 The Pilot That Proved Exactly What It Was Designed to Prove
Here is a conversation we have watched happen, in different clothes, at more than one shop.
"The pilot went great," says the sponsor. "Everyone loved it."
"How many tasks did it complete?" — "A lot. The team said it felt twice as fast."
"Who reviewed the output?" — "The same two seniors, in the evenings."
"How many of those changes broke something later?" — "We didn't track that."
"What did it cost per task?" — "We don't know yet. The invoice isn't in."
Nothing in that exchange is dishonest. Everyone is sincere. And none of it is evidence. It is a vibe report about a tool whose whole marketing position is that it is not vibe coding.
IBM's own executives make that distinction on stage. Neel Sundaresan, who runs Automation and AI at IBM, said: "It's not about vibe coding; it's about literal programming. It's not about accessibility, it's about security." IBM Think content goes further and says vibe coding "caused a new type of technical debt called security debt." If the vendor holds that line, the least a customer can do is hold the same line in the pilot.
In Part 1 we described what Bob is. In Part 2 we covered models, security, and the self-hosted option. In Part 3 we locked down the controls, the audit trail, and the economics. In Part 4 we walked through the four doors between Bob and Maximo. This final part answers the question the other four set up: how do you find out, with your own data, whether Bob is worth having on your Maximo estate?
💡 Key insight: The goal of a pilot is not to feel good about a tool. It is to produce a number you would be comfortable defending to the person who funds it, and a list of things you still do not know. This part gives you both.
📌 The Short Version
| Question | Short answer | Where it comes from |
|---|---|---|
| Can we plan around IBM's customer metrics? | No. All are IBM-reported, unaudited, and some carry inconsistent baselines | IBM newsroom; field guide §9 |
| What do independent sources say? | Useful but limited evidence; six recurring criticisms | IDC, RedMonk, The Register, Futurum, practitioners |
| Is Bob the only serious option? | No. Copilot, Cursor, Claude Code, and Kiro cover the same ground | Field guide §11 |
| What should a Maximo shop do first? | Run a six-week, 20 to 30 task, matched pilot | This part |
| Which metrics matter most? | Defect escape rate, review hours per accepted change, Bobcoins per accepted task | This part |
| What stops a pilot? | Any security incident, a defect escape rate above baseline, or review hours growing faster than output | This part |
| What can we not yet answer? | Sixteen items, including self-hosted audit logging and SaaS model versions | Field guide §16 |
A note on labels, because we use them throughout. [IBM] means the claim appears on an IBM page, press release, or IBM-published customer story. [IND] means it comes from an independent analyst, journalist, or practitioner. [TMG] means it is our assessment. We did not run Bob against a customer's production Maximo to write this series, and we say so where it matters.
📊 The Numbers IBM Publishes, and What Each One Is
Start by laying every figure on the table. The rule for this section comes straight from the field guide: every figure here is IBM-reported or appears in an IBM-published customer story, and none has been independently audited. The Register described IBM as "the latest to lean on its own staff to 'prove'" AI efficacy, and StockTitan noted that the productivity metrics are self-reported.
The customer scoreboard
| Claim [IBM] | Exact figure | What it actually is | What is missing |
|---|---|---|---|
| IBM internal adoption | 6,000+ (Oct 2025), 80,000+ (Apr 2026), 100,000+ (Jun 2026) | Employees onboarded | Active use, retention, task mix |
| Productivity | "average 45% productivity gain" | Self-reported survey of users | Baseline, sample, definition of productivity |
| IBM Maximo dev team | "estimated 69% time savings" | One sentence about IBM's own product team | Task mix, baseline, sample size, method, whether review time counted |
| IBM Instana | "average 70% reduction in time spent on selected tasks," about 10 hours a week | Internal team estimate on selected tasks | Which tasks were selected and why |
| Blue Pearl | "30-day Java upgrade in 3 days," over 160 hours saved, "zero defects post-deployment" | Customer story | A second IBM release frames it as nine months with 14 engineers done in three days |
| APIS IT (Croatia) | "10x faster architecture analysis," "100% accuracy" documenting JCL and PL/I | Customer story | How accuracy was evaluated |
| EY | Tax platform modernization | Customer story | No metric at all |
| Jack Henry | Accelerated RPG workflows | Customer story | No metric |
| CrushBank | 4 people over 4 to 6 weeks became 1 to 2 developers in about half the time | IBM customer material | Scope definition |
| Novadoc | Tool built in a weekend versus 2 weeks | IBM customer material | Comparison basis |
| IBM Z product page | "20 to 40% faster" complex engineering, 50 to 80% effort cut on structured workflows | Product page | Study design |
| IBM Payments Center | Testing effort down more than 70% on a regulated payments platform | IBM Think perspective | Scope of the testing |
How to read a case study, using Blue Pearl as the teaching example
The Blue Pearl story is a gift for training your skepticism, because it appears twice with different shapes. One IBM release says a typical 30-day Java upgrade took three days, saving over 160 engineering hours. A later release describes the same work as nine months with 14 engineers compressed into three days. Both cannot be the baseline. One is a per-upgrade number, the other is a program number, and nobody tells you which units the "three days" are in.
That is not an accusation. It is what marketing material looks like when several people write several releases. But it demonstrates the five questions you should ask of any vendor result, including ours:
| Question | Why it matters | Blue Pearl example |
|---|---|---|
| What was the baseline, and who measured it? | An estimate of "normally" is not a control | "Typical 30-day upgrade" vs "nine months, 14 engineers" |
| What was counted in the "after"? | Review, test, and rework are the expensive part | Not stated |
| Who did the work? | Experts on a known codebase flatter any tool | Customer engineers, unspecified |
| What was the unit? | Per task, per project, per year are different claims | Both appear |
| What did it cost to get there? | Coins, licenses, and senior review time | Not stated |
The Maximo number, one more time
The IBM Maximo team figure deserves a short repeat because it travels furthest. IBM says the Maximo development team used Bob for code generation, refactoring, and updates that "normally take days" and finished them in hours, for "an estimated 69% time savings." As we showed in Part 4, that is unusable for planning: no task mix, no baseline, no sample, no method, and the team that did the work is the team that owns the codebase.
IBM's own Think writing helps you here. Adam McDaniel's pieces say "Token consumption is a cost signal, not a value metric," "AI doesn't fix a team. It amplifies what's already there," and "Review capacity becomes the limiting factor." Quote IBM to IBM. It is the politest way to ask for a pilot.
The statistics IBM borrows from others
IBM's content also leans on third-party numbers. They are worth knowing because your stakeholders will have seen them.
| Statistic | Origin | Label | Use with care because |
|---|---|---|---|
| 85% of DevSecOps professionals say AI moved the bottleneck from writing to reviewing code | GitLab 2026 AI Accountability Report, cited in IBM's Jul 9 release | Third-party, repeated by IBM | It is a perception survey |
| Developers 19% slower while believing they were 20% faster | METR study | Third-party, repeated by IBM | Small sample, early-2025 tools (see below) |
| 84% use or plan to use AI; 46% distrust accuracy vs 33% trust | Stack Overflow 2025 survey | Third-party, repeated by IBM | Survey of attitudes, not outcomes |
| 79% of executives see AI productivity gains; only 29% can confidently measure ROI | IBM IBV | IBM research | That 29% is the gap this pilot closes |
| 60 to 80% of development budgets go to modernization | IBM Apr 28 release, external footnote | Cited by IBM | Footnoted source, not verified here |
| About 60% of work is migration, modernization, and maintenance; new code about 15% | Sundaresan, Think 2026 recap | IBM exec | Directionally matches Maximo reality, which is why this matters to you |
That last pair is the interesting one for a Maximo shop. If 60% of enterprise software work is migration, modernization, and maintenance, then the work Bob targets looks a lot like a Maximo estate: upgrade analysis, Java-to-script conversion, integration upkeep, report fixes. The fit argument is real. It is the magnitude argument that is unproven.
🧪 What Independent Sources Say
Independent coverage of Bob is real but thin, and the best analyst source says so itself. IDC's Adam Resnick wrote that "the external evidence base remains limited at GA" and described Bob's ecosystem anchoring (IBM Z, OpenShift, watsonx, HashiCorp) as both "its structural advantage" and "its natural boundary." Note that the IDC paper is published through IBM, which is common for analyst work and worth keeping in mind.
The independent views table
| Source [IND] | View | What to take from it |
|---|---|---|
| IDC, Adam Resnick (May 2026) | Bob is IBM's "most direct move yet into the agentic development tools market"; evidence base limited at GA | Credible direction, thin proof |
| RedMonk, Kate Holterhoff | Automatic model selection is "a double edged sword" | Convenience and opacity arrive together |
| VentureBeat | The difference versus Cursor and Claude Code "is not about capabilities but about control" | The pitch is governance, so test governance |
| Futurum, Mitch Ashley | On COBOL: "The best answer may well be a combined IBM plus Claude team"; self-hosting puts Bob "where cloud-first coding agents struggle to reach" | Competitors can be complements |
| The Register | IBM leans on its own staff to "prove" efficacy; broke the PromptArmor story | Read vendor metrics as marketing |
| BERI | Air-gapped Bob swaps Claude for Nemotron and Laguna; no evals, GPU sizing, or price published | Self-hosted is a different quality tier |
| Uwe Graf (IBM Champion, Planet Mainframe) | Useful for analysis, refactoring, training; during COBOL refactors Bob "occasionally defaults to older control-flow constructs"; some VSAM tuning reasoning "needed a closer technical review" | Output needs expert review |
| IBM i community, GitHub issue #3078 | Bob 2.0.3 "confidently hallucinates" what a real CL parameter value does | Confident wrongness exists |
| Northdoor, Tom Richards | Bob is "vibe coding putting on a navy blazer and walking into the enterprise boardroom" | The skeptic's headline |
| Yann Bordelanne (Sopra Steria, summarized on DEV) | Quality "depends heavily on the quality of the context provided"; formula "Context + Tools + Governance + Human Validation" | The only Maximo-specific independent test we know of |
The six recurring criticisms, and a pilot test for each
Independent coverage keeps returning to the same complaints. A good pilot converts each complaint into something you can observe.
| # | Recurring criticism [IND] | What to observe in your pilot |
|---|---|---|
| 1 | Productivity numbers are self-reported | Use timestamps, not surveys, and compare the two |
| 2 | Model choice is a black box | Log the date, time, and task for every response you rate; ask IBM which model family handled it |
| 3 | No OS-level sandbox; commands run as child processes | Use a disposable dev container and keep secrets out of the workspace (Part 3 covers .bobignore and workspace trust) |
| 4 | Legacy-language output can be dated or confidently wrong | Seed review with known pitfalls (for Maximo: deprecated Java APIs, count() in scripts, unclosed MboSets) and see whether Bob flags or repeats them |
| 5 | Air-gapped mode runs on a weaker model tier | If you will self-host, run the pilot on the self-hosted model, not the SaaS demo |
| 6 | Admin audit covers identity and admin events more than agent actions | Try to reconstruct, from logs alone, what the agent did to one specific change |
The METR study, with its own caveat attached
IBM repeats the METR finding, so you will meet it. Here is what it was. METR ran a randomized controlled trial with 16 experienced open-source developers working on 246 real issues in mature repositories, averaging about two hours each. Developers forecast that AI would speed them up by 24%. With AI tools allowed, they took 19% longer. After the fact, they still believed AI had sped them up by 20%. Time was self-reported by the developers while their screens were recorded.
The authors were careful about what they did not claim: not that AI fails to help most developers, not that results apply beyond that setting, not that future AI won't improve, and not that other usage approaches couldn't produce speedups. They flagged learning effects (developers had about 50 hours of Cursor experience) and possible sampling bias. And the METR page now carries a prominent banner that these results are out of date, pointing to a February 2026 update on late-2025 tools.
So do not use METR as a stick to beat Bob with, and do not let anyone use "AI makes you faster" as a counterweight either. Use it for the one thing it proves beyond argument: people are bad at estimating their own AI-assisted speed. That is why the pilot in this part measures with timestamps and treats surveys as a separate, labeled column.
💡 Key insight: The perception gap is the whole case for measurement. If developers who just did the work cannot tell whether they were 19% slower or 20% faster, your sponsor, who only saw the demo, certainly cannot.
⚔️ The Competitive Landscape, Through a Maximo Lens
Bob does not arrive in an empty field. The field guide's landscape table is a fair starting point, and we extend it with the questions a Maximo team should ask.
Positioning table
| Tool | Positioning [IBM/IND] | Versus Bob |
|---|---|---|
| GitHub Copilot | Ubiquitous IDE assistant plus coding agent; GitHub-native | Broader ecosystem and user-selectable models; Bob is deeper on IBM platforms and governance |
| Cursor | AI-native VS Code fork; fast iteration; model picker | Same form factor; Cursor lets you pick models; Bob routes automatically and adds approval stages |
| Claude Code (Anthropic) | Terminal-first agent; hooks, skills, MCP, subagents | Very similar primitives; Bob also uses Claude models on SaaS; Futurum suggests combining them for COBOL |
| Kiro (AWS) | Spec-driven agentic IDE; replaced Amazon Q Developer | Comparable plan-then-implement discipline; AWS-anchored rather than IBM-anchored |
| watsonx Code Assistant | IBM's predecessor | Superseded by Bob; IBM promises an adoption path but has published no end-of-support date |
Where Bob is differentiated, and where it trails
| Bob differentiators [IBM] | Bob trails [IND] |
|---|---|
| IBM Z, IBM i, and Java modernization packages | Model transparency and choice |
| Self-hosted OpenShift deployment with air-gap support | Independent evidence base |
| Enterprise IP indemnity (Enterprise plan only) | Ecosystem outside IBM estates |
| Group policies for MDM/GPO-style control | Audit that reaches agent actions, not only admin events |
| IBM documentation RAG | Self-hosted model quality at GA |
The price context
| Tool | Entry or team price (2026; verify on vendor pages) |
|---|---|
| Bob Pro / Pro+ / Ultra | $20 / $60 / $200 per month (50 / 180 / 1,000 Bobcoins) |
| Cursor | $20 / $40 |
| GitHub Copilot | $10 Pro / $19 Business |
| Claude (Pro / Max) | $20 / $100 to $200 |
| Amazon Q Developer | Replaced by Kiro |
Bob's base price sits in the market band. The differences are the opaque coin-to-token rate, no model choice, and indemnity only at Enterprise. Part 3 covers the Bobcoin economics in detail.
What matters for Maximo specifically
Most of the market comparison is about general coding. For Maximo, five questions decide more than the feature matrix.
| Maximo-specific question | Why it matters | How to test |
|---|---|---|
| Can the agent act as an MCP client against the MAS 9.2 server or Max_mcp? | Door 4 from Part 4 is the only door that touches live data | Read-only key, sandbox, tools/list, one safe read |
| Can you load house rules (autoscript standards, naming, logging) into the agent? | Output quality tracks context quality | Same task with and without a rules file |
| Does the agent handle Jython and Nashorn script patterns, MboSet handling, and launch point selection? | IBM's own community guidance says avoid count(), avoid service.log(), and don't call save() or close() on MboSets you did not get from MXServer | Seed a script with these anti-patterns and check findings |
| Can approvals and policies be enforced centrally? | Auto-approve is where the PromptArmor incident lived | Apply the Part 3 policy list, then try to bypass it |
| Is the cost per accepted task predictable? | Coins are consumed by failed attempts too | The ledger in this part |
Notice that the last four are agent-neutral. That is deliberate. Run the same ledger against a second agent on a subset of tasks. If Bob wins, you know it; if it ties, you have negotiating leverage; and if it loses, you saved yourself a year of licenses. TMG's Max_Interfaces, Max_mcp, and Max_autoscripts are agent-neutral by design, so the Maximo-side setup does not change when the agent does.
A different category worth naming
One more thing for the landscape. Interloc Solutions has launched interloc.ai, which it describes as an agentic AI platform for IBM Maximo: an orchestrator coordinating specialized agents that interpret service requests, create and update work orders, and push approved actions through Maximo's existing APIs and security model. That is not a coding agent. It is an operations agent. We mention it so you do not conflate the categories: Bob helps people who build and maintain Maximo configuration and code, while operational agents act on the work management process itself. Different budgets, different risk owners, different pilots.
🧭 Eight Points of Guidance for Maximo Teams
The field guide ends its analysis with eight points. We expand each one into something you can assign to an owner and check off.
The eight points, expanded
| # | Guidance | Maximo meaning | Owner | Evidence you can show |
|---|---|---|---|---|
| 1 | Credible option, but don't buy it for the 69% | Justify the pilot with fit (IBM skills, MCP, Local Dev Mode), not with the internal estimate | Sponsor | Business case cites your pilot metric, with the IBM figure footnoted |
| 2 | Plan, then act | Use Plan mode for any Manage customization and attach the plan to the change record | Change manager | Plan output linked in each change ticket |
| 3 | Agents go through the API layer, never the database | MAS 9.2 MCP server or Max_mcp, dedicated read-only API key first, scoped write key per use case, destructive tools annotated | Security / integration lead | Key inventory, group definition, annotation list |
| 4 | Lock auto-approve centrally | DisabledAutoApprovalGroups=edit,execute,mcp on machines touching client code; workspace trust; .bobignore for .env, keystores, maximo.properties | Endpoint / security | Policy file, screenshot of enforced state |
| 5 | Feed it house rules | Put autoscript standards into .bob/rules/ or an AGENTS.md | Tech lead | Rules file in the repo, with a before/after task |
| 6 | Choose SaaS vs self-hosted deliberately | Regulated utilities, defense, and public sector may need self-hosted: OpenShift 4.20+, about 36.5 vCPU and 53 GiB for Bob Core, plus GPUs, no Bobalytics, weaker model tier | Architect / compliance | Decision record with the constraints that forced it |
| 7 | Consultancies: watch the indemnity line | Only Enterprise seats carry IP indemnity; Pro, Pro+, and Ultra seats on client code do not | Practice lead / legal | Seat type per engagement |
| 8 | Measure value, not just activity | Pair Bobalytics' Bob factor with defect escape rate, review hours, and Bobcoins per completed task | PMO | The scorecard in this part |
Guidance 3 in practice: the key and the group
Because point 3 is where most pilots go wrong, here is the shape of a conservative setup. The details come from the pattern in Part 4, and every name below is a placeholder for your own.
# Pilot identity (non-production only)
Service user: BOBPILOT_RO # one human owner on record
Security group: BOBPILOT_RO_GRP # read-only on 2-3 object structures
API key label: bob-pilot-readonly-w1 # rotate weekly; store in secret manager
MCP annotations: all create/update/delete tools flagged destructive
alwaysAllow: [] # empty until weeks of observationThe point is that the security group is the enforcement. Approval clicks and annotations are gates and hints, not walls. IBM's documentation notes that when you refresh authentication tokens for API keys, new tokens are generated and the current ones expire, so plan rotation and expect integrations that cached the old token to fail until updated.
Guidance 4 in practice: policy as a checklist
| Control | Setting | Verify by |
|---|---|---|
| Auto-approval disabled for risky groups | DisabledAutoApprovalGroups=edit,execute,mcp | Try to enable auto-approve in the UI; confirm it is blocked |
| Workspace trust | Enabled | Open an untrusted folder; confirm restricted behavior |
| Secret exclusion | .bobignore lists .env, keystores, maximo.properties | Ask Bob to read each file; confirm refusal |
| Update mode | UpdateMode set to a pinned value | Check the installed version on three machines |
| Hooks | EnforcedHooks logging every tool call | Reconstruct one change from the hook log |
| Bob Shell on CI | Policy coverage unconfirmed (documented as Bob IDE only) | Do not run Bob Shell in CI during the pilot |
That last row is an open question, and it appears again in the checklist at the end.
🎯 Designing the Pilot
This is the section to keep. Everything before it is context. Everything after it is what you do with the results.
Principles
| Principle | Reason |
|---|---|
| Matched tasks, not volunteers' favorites | Cherry-picked tasks guarantee a good story |
| Both arms timed with the same clock | Self-report is the exact failure METR documented |
| Count accepted work, not attempted work | Failed attempts burn coins and reviewer time |
| Review is a first-class cost | IBM's own sources say it is the limiting factor |
| Pre-register the stop conditions | You will be tempted to explain away a bad week |
| Record what you do not know | The open-questions list is part of the deliverable |
Scope: six weeks, 20 to 30 tasks, three task families
Pick task families that map to the high-fit rows from Part 4 and that you can test. Avoid anything that touches production data.
| Family | Example tasks | Why it suits a pilot | Verification |
|---|---|---|---|
| A. Java MBO to automation script | Convert a custom field-validation class to a script on an object launch point | Pattern-heavy and testable; IBM skill exists | Unit-style test in a sandbox; behavior diff |
| B. Autoscript review and refactor | Review existing scripts against your standards; fix count() use, logging, MboSet handling | IBM skill exists; house rules apply | Review checklist; performance measure on a copy |
| C. Integration or report change | Add a field to an outbound integration payload; adjust a BIRT report | Medium-high fit; needs accurate API context | Payload diff; report output compare |
Eight to ten tasks per family gives 24 to 30 in total. If you can only find twelve tasks, run twelve and report a wide uncertainty. Do not pad.
Arms and assignment
For each task, define the baseline method (what your team would normally do) and the Bob method. For a small pilot, a pure randomized design is unrealistic, so use matched pairs:
- Sort candidate tasks by estimated size (S, M, L) within each family.
- Pair tasks of similar size and risk.
- Flip a coin per pair to assign Bob or baseline.
- Have developers of mixed seniority on both arms. Do not give Bob only to your best people.
If your team is too small to split, use a crossover: each developer does comparable tasks in both arms, in alternating order, to cancel learning effects. Learning effects are real. METR flagged them, and Bob has its own idioms such as Plan mode and rules files that take a couple of weeks to use well. Plan a week-one warm-up that is excluded from the numbers.
The six-week schedule
| Week | Focus | Gate to continue |
|---|---|---|
| 0 | Policy applied, ledger created, rules file written, read-only key issued; baseline tasks selected | Policy verified (checklist above) |
| 1 | Warm-up tasks, excluded from analysis | No security incidents |
| 2 to 3 | Family A and B tasks, both arms | Ledger complete for every task |
| 4 | Family C tasks; first review-hour read-out | Review hours per change not exploding |
| 5 | Remaining tasks; 30-day defect window starts for early merges | Defects logged consistently |
| 6 | Close ledger, compute metrics, write the go/no-go memo | Open-questions checklist updated |
Because defects escape after merge, six weeks is a floor. Plan a short follow-up read at day 30 and day 60 after the last merge, and state in the memo that defect escape numbers are provisional until then.
📏 The Metrics, Defined So They Cannot Be Fudged
Vague metrics are how pilots prove whatever the sponsor hoped for. Each metric below has a definition, a formula, a source of truth, and a trap.
Headline metrics
| Metric | Definition | Formula | Source of truth | Trap to avoid |
|---|---|---|---|---|
| Defect escape rate (DER) | Share of merged changes that cause a defect after review, within a fixed window | defects attributed to merged changes ÷ merged changes, per arm, over 30 days | Your defect or incident tracker, tagged to the change ID | Counting only defects Bob "caused" versus defects in AI-assisted changes |
| Review hours per accepted change | Reviewer time from assignment to approval, including re-reviews after rework | sum of reviewer hours ÷ accepted changes | Timestamps in the pull request or change tool; reviewers log minutes | Reviewers skimming because the output looks polished |
| Bobcoins per accepted task | All coins consumed on the task, including failed and abandoned attempts, per task that was accepted | coins consumed ÷ accepted tasks | Bob usage data per user, tagged by task window | Dividing by attempted tasks, which flatters the tool |
Supporting metrics
| Metric | Definition | Why it earns its place |
|---|---|---|
| Acceptance rate | Accepted tasks ÷ attempted tasks | Exposes tasks the agent could not finish |
| Rework cycles | Number of review-then-change loops before acceptance | Review capacity is the bottleneck |
| Time to accepted | Wall-clock from task start to acceptance | Captures waiting on reviewers |
| Total human hours per accepted task | Author + review + test + rework hours | The honest "time saved" figure |
| Perception gap | Developer's estimated time saved minus measured time saved | Quantifies the METR effect in your team |
| Policy exceptions | Count of blocked or overridden approvals | A security signal, not a productivity one |
| Standards findings | Count of violations of your autoscript standards in delivered output | Tests the "feed it house rules" point |
Cost per accepted task, with an illustrative calculation
You will need a unit cost. Bobcoin pricing is published as $20 per month for 50 coins on Pro ($0.40 per coin), $60 for 180 on Pro+ (about $0.33), $200 for 1,000 on Ultra ($0.20), with Enterprise priced as custom allotments and packs at $550 per 1,000 coins. IBM does not publish tokens per Bobcoin, and self-hosted pricing is not published. Individual overage was recorded at about $0.50 per coin by a third-party tracker. Verify all of these on bob.ibm.com before you use them.
Here is an illustration with invented numbers, to show the arithmetic. These are not measurements.
| Item | Bob arm | Baseline arm |
|---|---|---|
| Tasks attempted | 12 | 12 |
| Tasks accepted | 10 | 12 |
| Coins consumed (all attempts) | 60 | n/a |
| Coin price assumed | $0.55 (Enterprise pack rate) | n/a |
| Coin cost | $33.00 | $0 |
| Author hours (total) | 18 | 40 |
| Review hours (total) | 14 | 10 |
| Test and rework hours (total) | 9 | 8 |
| Human hours per accepted task | (18+14+9) ÷ 10 = 4.1 | (40+10+8) ÷ 12 = 4.8 |
| Coins per accepted task | 60 ÷ 10 = 6.0 | n/a |
| Human cost at $90/hour per accepted task | $369 | $432 |
| Coin cost per accepted task | $3.30 | $0 |
| Total cost per accepted task | $372.30 | $432.00 |
Read what the illustration says. Author hours fell sharply, review hours rose, and total human hours fell only a little. The coin cost is trivial next to the labor, which is typical: the bill that matters is people. A vendor figure that says "69% faster" and a measured figure that says "15% fewer total hours with more review burden" tell very different stories, and only the second helps you staff next quarter. If your real numbers look like this, the decision depends on defect escapes, and that is why DER is the first headline metric.
The ledger
Create the ledger before week one and make it a rule that no task starts without a row. A flat file is enough. Here is a CSV header and one example row.
task_id,family,size,arm,developer,started_at,accepted_at,author_min,review_min,test_min,rework_cycles,coins_used,accepted,change_id,defects_30d,standards_findings,dev_estimate_saved_min,notes
A-03,A,M,bob,dev2,2026-10-20T09:05,2026-10-20T14:40,95,70,40,1,6,yes,CHG-10482,0,1,120,"converted validation MBO; Plan output attached"And a short script to compute the headline metrics per arm. It is deliberately plain so reviewers can audit it.
import csv
from collections import defaultdict
rows = list(csv.DictReader(open("ledger.csv")))
arms = defaultdict(lambda: dict(n=0, acc=0, coins=0, review=0, human=0, defects=0))
for r in rows:
a = arms[r["arm"]]
a["n"] += 1
a["coins"] += int(r["coins_used"] or 0) # failed attempts included
if r["accepted"] == "yes":
a["acc"] += 1
a["review"] += int(r["review_min"])
a["human"] += int(r["author_min"]) + int(r["review_min"]) + int(r["test_min"])
a["defects"] += int(r["defects_30d"] or 0)
for arm, a in arms.items():
acc = max(a["acc"], 1)
print(f"{arm}: accept={a['acc']}/{a['n']} "
f"review_h/accepted={a['review']/60/acc:.2f} "
f"human_h/accepted={a['human']/60/acc:.2f} "
f"coins/accepted={a['coins']/acc:.1f} "
f"DER={a['defects']/acc:.2f}")Two details matter. First, coins_used is summed for every row, accepted or not, so abandoned attempts raise the numerator. Second, human hours include review and test, so a change that is fast to write and slow to trust gets no free pass.
Capturing Bobcoins per task
Bob's usage data is reported per user, not per task, so you need a convention to attribute coins. A simple one works: each developer records the Bobcoin balance before and after each task window, and the project lead reconciles weekly against the account usage view. Where the tool shows usage in a different grain, reconcile the weekly total to the ledger sum and report any difference. If the totals disagree by more than about 10%, say so in the memo rather than quietly rounding.
🛑 Stop Conditions and Go/No-Go Thresholds
Write these down before week one and get the sponsor to initial them. People are far more flexible about stop conditions after the fact.
Stop conditions (any one halts the pilot)
| Trigger | Action |
|---|---|
| An agent action touches a production system or production data | Stop immediately, revoke the key, run an incident review |
| A secret appears in a prompt, log, or output | Stop, rotate, review .bobignore and workspace contents |
| An approval policy is bypassed or disabled on any pilot machine | Pause until the cause is fixed |
| Defect escape rate on the Bob arm exceeds the baseline arm by more than an agreed margin after 4 weeks | Pause and review the failure patterns |
| Reviewer hours per accepted change grow week over week for three weeks | Pause and test whether the bottleneck is rules, task choice, or review practice |
| Any task is found to have fabricated a Maximo object, field, or API that review missed | Log as a critical finding and add to the review checklist |
Go/no-go matrix
These thresholds are examples. Set yours with the sponsor, and set them before you see the data.
| Result | Reading | Decision |
|---|---|---|
| DER at or below baseline, total human hours down 15% or more, review hours not up more than 25% | Credible, review-sustainable benefit | Go for a wider rollout in the task families that won |
| DER at or below baseline, total human hours flat, review hours up | Work shifted, not saved | Conditional: improve rules and task selection, re-pilot four weeks |
| DER above baseline | Quality cost exceeds speed benefit | No-go until the failure patterns are fixed |
| High acceptance, low review confidence (reviewers say they cannot verify) | The tool is outrunning your review process | No-go for that task family; consider only with stronger test harness |
| Good results only in Family A | Fit is narrow | Go narrowly: license a few seats, keep the rest out |
Notice that a narrow go is a perfectly good outcome. Java-to-script conversion alone may justify a small number of seats for a defined project, and you do not owe anyone an estate-wide rollout because a pilot succeeded somewhere.
🔬 Worked Scenarios: What You Will Actually See
These are the situations our practitioners expect, based on the Part 4 scenarios and the pattern of independent reports. They are forecasts of what to look for, not results, because we have not run a customer pilot.
Scenario 1: The conversion that passes the sniff test
A custom Java MBO validation class becomes an automation script. Bob's output compiles, runs, and passes the test you wrote. The reviewer approves in ten minutes.
What to check before you count this as a win:
| Check | Why |
|---|---|
| Is the launch point equivalent to where the Java ran? | A different event changes when the logic fires |
| Are MboSet handling and cleanup consistent with IBM's guidance? | IBM community guidance says not to call save() or close() on MboSets you did not get from MXServer |
| Does the script avoid count() where notExist() would do? | IBM community guidance flags count() for performance because it requires returning all records |
| Is logging object-specific and guarded by isDebugEnabled? | The same guidance recommends object-specific loggers over service.log() |
| Did anything about error messages or message keys change? | Users see these |
If the script passes all five, that task is accepted, counted, and its review time logged at its real value. If it passes the tests but fails two of the five, that is exactly the kind of finding that belongs in "standards findings" and in your house rules file.
Scenario 2: The review that finds real problems and invented ones
You point the autoscript optimizer skill at fifteen existing scripts. It reports forty findings. Some are real, such as count() in a hot path. Some are stylistic. A couple refer to a method that does not exist on that object.
This is where the independent critiques bite. The IBM i issue that triggered the "confidently hallucinates" comment was a wrong claim about a real parameter value. Your control is simple: every finding gets a verdict.
| Verdict | Meaning |
|---|---|
| Confirmed | Reviewer reproduced or verified against IBM docs |
| Style only | Valid but not a defect; goes to standards, not defects |
| Wrong | Finding is inaccurate; log the claim and the correct answer |
| Unverifiable | Reviewer cannot tell; counts against review hours and is a warning sign |
Report the wrong plus unverifiable share as a headline in the memo. If one finding in five is wrong, your review cost is real and no vendor percentage reflects it.
Scenario 3: The integration change that needs context
You ask for a new field in an outbound payload and a matching mapping change. Without an accurate API catalog in context, Bob guesses at an attribute name. With an object structure export and your standards file in context, it gets it right on the first pass. This is the Bordelanne conclusion in miniature: "The quality of the output depends heavily on the quality of the context provided."
The pilot test is cheap: run the same task twice, once with a thin prompt and once with rules and an API catalog, and log the coin cost and the review result of each. If context lifts acceptance and cuts review hours, that is evidence for investing in rules files regardless of which agent you buy. Max_Interfaces' endpoint library and Max_autoscripts' standards file are natural context sources, and both are MIT-licensed.
Scenario 4: The tempting read-write experiment
Week five, someone proposes: "Let's let it fix the stuck work orders through MCP." This is the demo from Part 4 and it is the moment a pilot either keeps its discipline or loses it.
| Question | Required answer before proceeding |
|---|---|
| Is the key scoped to named object structures and a defined set of sites? | Yes, in writing |
| Is there a dry run that lists the records it would touch? | Yes, reviewed by a human |
| Are destructive tools annotated? | Yes |
| Is this a non-production environment? | Yes |
| Who approves, and where is that recorded? | A named person, in the change record |
If any answer is no, the experiment waits. A pilot designed to measure code-change productivity should not turn into a production automation project halfway through.
⚠️ Pitfalls and Troubleshooting
| Symptom | Likely cause | What to do |
|---|---|---|
| Developers report big savings, timers show little | The perception gap; self-reported time | Report both columns, trust the timers |
| Review hours climb while authoring hours fall | Work moved from writing to reviewing | Improve rules, add tests, shrink diff sizes; do not hide the shift |
| Bobcoin consumption is erratic across similar tasks | Unknown model routing; long contexts; retries | Record task context size and retries; ask IBM about routing |
| Coins per accepted task far above expectations | Failed attempts and abandoned sessions | Count them; they are real cost |
| Findings cannot be verified by reviewers | Output sounds authoritative but is not checkable | Require evidence (doc link, test) per finding |
| Pilot machines show different approval behavior | Policy not uniformly enforced | Re-verify the policy checklist; pin UpdateMode |
| Defects appear in the baseline arm too | Task difficulty, not tool | That is why you matched tasks; report relative, not absolute |
| Skill output differs from README promises | IBM moved paths or names | Pin the commit of every IBM asset, as Part 4 advised |
| Tool works great on SaaS, poorly self-hosted | Different model tier | Evaluate the deployment you will actually run |
| Sponsor wants the 69% on the slide | Anchoring | Offer the pilot number and keep IBM's figure in a labeled footnote |
Five failure patterns we expect most
- The senior-only pilot. Only your best developer uses Bob, so success cannot be separated from the person.
- The warm-up counted. Week-one learning effects distort the first numbers in both directions.
- The unreviewed win. Output that looks polished is approved quickly, and the defects arrive after the window.
- The moving goalposts. Thresholds change after the data arrives.
- The scope creep. A code pilot becomes a production-automation project.
✅ The Open Questions as a Verification Checklist
The field guide closes with a backlog of items that could not be verified or where IBM sources conflict. Here they are rewritten as a checklist you can hand to your IBM seller or technical contact. For each, we note why it matters, who to ask, and what evidence would settle it.
Blocking questions: settle before signing
| # | Open question | Why it matters | Ask | Acceptable evidence |
|---|---|---|---|---|
| 1 | Self-hosted audit logging. The September blog says self-hosted "includes identity, the inference gateway, audit logging, and usage metering." The solution-architecture doc says Audit Logs and Metering services are "Not included in the initial release; planned." Known limitations say activity logs are not in the Admin UI | A regulated client will ask for an audit trail | IBM technical sales | Written statement of what is logged, where, and in which release |
| 2 | SaaS audit scope. CADF activity logs cover authentication and admin events. Unclear whether prompts, tool calls, and file edits reach Splunk SIEM | Reconstructing what an agent did | IBM support | SIEM event schema with a sample |
| 3 | SaaS model versions. IBM names families (Claude, Mistral, Granite) but not versions or routing policy, and shows no per-task model | Reproducibility, risk review, rating comparisons | IBM | Documented routing policy or contractual disclosure |
| 4 | Bobcoin economics. Tokens per Bobcoin are unpublished; individual overage about $0.50 per coin (third-party tracker) versus Enterprise packs at $550 per 1,000; self-hosted pricing unpublished | Budgeting and cost per task | IBM sales | Quote with unit rate and overage terms |
| 5 | Group policies on Bob Shell. Documented as Bob IDE only | CI runners and terminal use | IBM | Documentation that names Shell coverage |
| 6 | No public SOC 2, FedRAMP, or ISO 42001 statement for Bob. Only "IBM is ISO 27001 certified," with artifacts under NDA | Vendor risk assessments | IBM security | Reports or attestation letters under NDA |
| 7 | Guardrail mechanisms. IBM names prompt normalization, sensitive data scanning, real-time policy enforcement, and AI red-teaming but does not document how they work | Security review | IBM | Architecture description |
Questions that sharpen the business case
| # | Open question | Why it matters | Ask |
|---|---|---|---|
| 8 | Maximo 69% methodology. Task mix and measurement method | Whether the figure can be cited at all | IBM Maximo team |
| 9 | Customer metric consistency. Blue Pearl appears as 30 days to 3 days and as nine months with 14 engineers to three days | Credibility of case studies | IBM marketing |
| 10 | Self-hosted GPU sizing. IBM publishes none for Nemotron, Laguna, or Mistral | Real cost of self-hosting | IBM |
| 11 | Self-hosted model list inconsistencies. The supported-models page lists Gemini 3.7 Flash while config examples use gemini-3.6-flash and gemini-3.1-pro; "Mistral 3.5" versus mistral-medium-3-5-0; the Oct 1 release names no models; third-party coverage says Nemotron and Laguna at GA | What you are actually buying | IBM |
| 12 | WCA end-of-support date. Only "adoption path" language | Migration planning if you use watsonx Code Assistant | IBM |
Questions that affect how you describe Bob
| # | Open question | Plain statement to use until resolved |
|---|---|---|
| 13 | Self-hosted GA date. Three candidates: September 24 (release blog says "As of September 24, 2026… generally available"), September 30 (FACTBASE), October 1 (newsroom announcement, which does not say "GA") | "GA September 24 per release notes; announced October 1 per newsroom" |
| 14 | Bob 1.0 versus GA. Bob 1.0.0 shipped March 24, 2026; global GA was announced April 28 | "1.0 in March, global GA announced April 28" |
| 15 | Rollback and git. The V2 blog says rollback no longer depends on git; the FAQ still says it uses git | "Confirm rollback behavior against current docs before relying on it" |
| 16 | Bob plus MAS 9.2 MCP end to end. No IBM or community write-up shows Bob calling the native Maximo MCP server in production; the Bordelanne MCP scenarios were speculative | "Supported in principle, not demonstrated publicly" |
Sixteen items. A few more from Part 4 sit alongside them: the streamable HTTP versus SSE transport match, the full per-tool schemas for the MCP server, the optimizer web app's data path, and a code audit of the skill scripts before you run them. Add them to your own copy.
How to use the checklist
- Put it in a shared document with a status column: Open, Asked, Answered, Accepted risk.
- Send the blocking list to IBM in writing and keep the replies. A verbal answer from a seller is not evidence.
- Decide for each blocking item whether an unresolved answer is a stop or an accepted risk, and have the risk owner sign it.
- Re-check the list at the end of the pilot. Several of these were moving targets in the weeks we wrote this series, and the repository path drift we found in Part 4 is a reminder that IBM's pages change.
💡 Key insight: An honest "we don't know yet" with a named owner and a date is worth more in a steering committee than a confident number nobody can source. The open-questions list is not a weakness of the pilot. It is part of the deliverable.
🗺️ Where This Series Leaves You
Five parts, one thread. Here is the whole arc in one table.
| Part | Question it answered | The takeaway you should keep |
|---|---|---|
| 1: What IBM Bob Is | What is it, and where did it come from? | Bob is IBM's agentic SDLC platform on the WCA lineage, rebuilt as V2 in June 2026; conflicting dates are carried, not hidden |
| 2: Models, Security, Self-Hosted | What does it run on, and where does your data go? | SaaS routes models automatically; self-hosted uses one core model on OpenShift; both have limits you must know |
| 3: Governance, Pricing, Bobcoins | How do you control and pay for it? | Lock auto-approval, treat hooks as your action log, treat the audit trail as incomplete until IBM says otherwise |
| 4: Bob Meets Maximo | What can it actually do against Maximo? | Four doors with four risk profiles; open them in order; the 69% is one sentence |
| 5: The Pilot Playbook | How do you decide? | Measure accepted work, review hours, and defect escapes yourself, and keep a list of what you still don't know |
The Ten Commandments of a Bob Pilot on Maximo
- Pilot before you buy, and buy only what the pilot supports.
- Never cite an IBM number without the word "IBM-reported."
- Measure with timestamps, because developers cannot feel their own speed.
- Count accepted work, not attempted work, in every ratio.
- Treat review hours as the headline cost, because review capacity is the limit.
- Match your tasks and include people of mixed seniority on both arms.
- Write the stop conditions first and have the sponsor initial them.
- Keep agents on the API layer, read-only first, with the security group as the wall.
- Test the deployment you will run, especially if that is self-hosted.
- Publish your unknowns alongside your results.
Your next steps
This week:
- Pick the three task families and list 30 candidate tasks with sizes.
- Draft the ledger header and the stop conditions, and get the sponsor's initials.
- Send the seven blocking questions to your IBM contact in writing.
Before week one:
- Apply and verify the policy checklist on every pilot machine.
- Issue the read-only pilot key, scoped to two or three object structures, in a non-production environment.
- Write the rules file from your autoscript standards, and run one dry task to test the ledger.
At the end of week six:
- Compute the metrics with the plain script, per arm, and show the perception gap.
- Write the go/no-go memo using the matrix, including a narrow go as a legitimate result.
- Schedule the day-30 and day-60 defect read-outs, and update the open-questions checklist.
If your numbers beat the baseline, you will have the best evidence anyone has published about Bob on Maximo, and it will be yours. If they do not, you will have saved the cost of an annual commitment and learned where the tool's limits sit. Both are good outcomes. A pilot with no possible bad outcome was never a pilot.
References
- IBM Bob GA announcement, April 28, 2026 (IBM Newsroom)
- IBM advances enterprise AI software development with multi-agent capabilities, July 9, 2026 (IBM Newsroom)
- IBM introduces self-hosted deployment for IBM Bob, October 1, 2026 (IBM Newsroom)
- Bob September 2026 release (Bob blog)
- Getting the most out of Bob (Bob blog)
- Bob pricing (bob.ibm.com)
- Bobcoins (Bob docs)
- Self-hosted solution architecture (Bob docs)
- Self-hosted known limitations (Bob docs)
- Tokenmaxxing is dead, long live valuemaxxing (IBM Think)
- Where AI costs are made and saved in software development (IBM Think)
- Vibe coding (IBM Think)
- Measuring the Impact of Early-2025 AI on Experienced Open-Source Developer Productivity (METR)
- The Register, IBM Bob reaches general availability
- Futurum, IBM vs. Anthropic: a tale of the COBOL modernization tape
- IBM i hallucination issue #3078 (GitHub)
- From Code Assistant to Maximo Gateway: Exploring IBM Bob on Real Maximo Challenges (DEV Community)
- Automation Scripts: Do/Don't, Performance & Code Styling (IBM Community)
- Interloc Solutions launches interloc.ai, AI agents built for IBM Maximo (TechJack Solutions)
- IBM MAS 9.2 and MCP: What Changes for Maximo Teams (Naviam)
- Introducing Maximo Application Suite 9.2 (IBM)
- Maximo MCP server overview (IBM Documentation, MAS 9.2)
- Max_Interfaces (TheMaximoGuys, MIT)
- Max_mcp (TheMaximoGuys, proprietary)
- Max_autoscripts (TheMaximoGuys, MIT)
Continue the Series
This is the finale. Where to go from here:
Back to: Part 4, Bob Meets Maximo | Part 3, Governance, Pricing, and Bobcoins | Part 2, Models, Security, and Self-Hosted | Part 1, What IBM Bob Is | Series Index
About TheMaximoGuys: We help Maximo developers and teams navigate the move to MAS 9 with practical, no-hype guidance grounded in how the platform actually behaves.
Published by TheMaximoGuys | October 2026