4 posts tagged “Dispatching”

The series finale. How an optimized schedule surfaces in Graphical Assignment and the Dispatching Dashboard, the review-adjust-re-optimize rhythm dispatchers actually run, AppPoints licensing math, the Phase 4 rollout timeline, and the three documented use cases — field service, maintenance-window planning, emergency response — with the payoffs that prove Optimizer worked.

A five-part program for standing up true scheduling optimization in IBM Maximo Application Suite 9 — from why the 7.6 Scheduler was never an optimizer, through the constraint-and-objective model, the labor and location data it lives or dies on, routing and ArcGIS spatial integration, to the Dispatching Dashboard and a phased, Phase-4 rollout.

A practitioner's deep dive into the Maximo Manage 9 scheduling stack — Gantt-based Graphical Scheduling for outages and projects, Graphical Assignment for short-horizon dispatch, the crafts/crews/calendars foundation, and the AI-driven Field Service Management solution introduced in 9.0 with its Scheduling and Dispatching dashboards, extended in 9.1.

How MAS 9 replaces Start Centers with Operational Dashboards, Result Set Portlets with Work Queues, and unlocks Graphical Scheduling for free. Complete coverage of card types, KPI Manager, Work Queue configuration, and the 8 scheduling applications now included in base Manage.