Energy & UtilitiesCase Study

Energy Utility: MAS 8.x Upgrade Acceleration

Reduced migration time by 40% using our MAS Upgrade Assistant and automated testing tools.

Project Details

Client
Leading Regional Energy Provider
Location
North America
Duration
8 months
Team Size
12 specialists

The Challenge

A leading energy utility was running Maximo 7.6 with extensive customizations and needed to migrate to MAS 8.x. The complex customizations, integrated third-party systems, and the need for zero production downtime made this a high-risk project with tight deadlines.

Our Solution

Our team developed a comprehensive migration strategy that included: • Automated migration tools to handle custom object structures • Comprehensive testing framework with automated regression testing • Phased rollout strategy to minimize risk • Custom integration adapters for third-party systems • 24/7 monitoring during the transition period

Implementation Timeline

1
Phase 1: Assessment and Planning (2 months)
2
Phase 2: Development Environment Setup and Testing (3 months)
3
Phase 3: User Acceptance Testing and Training (2 months)
4
Phase 4: Production Migration and Go-Live (1 month)

Results Achieved

40% reduction in migration time compared to industry standards
Zero production downtime during cutover
100% data integrity maintained throughout migration
All custom integrations successfully migrated
15% improvement in system performance post-migration

Technologies Used

MAS 8.xMaximo 7.6REST APIsAutomated TestingDockerKubernetes
"The Maximo Guys delivered an exceptional migration experience. Their automated tools and methodical approach gave us confidence throughout the entire process."
John Smith
IT Director
Regional Energy Provider